System 07

Concrete Densification

Concrete densification treats suitable concrete to improve surface hardness and reduce dusting. It is selected after reviewing the slab condition, desired finish and expected operational demands.

Concrete Densification
Concrete Densification

System profile

Specification starts with the operating environment.

System
Concrete densification
Finish
Hardened concrete surface
Application
Industrial slabs and suitable concrete floors
Traffic
Pedestrian and wheeled traffic as specified
Surface
Sound concrete substrate
Maintenance
Routine cleaning with dust control checks
Typical Use
Factory floors, industrial slabs and concrete preparation

Performance

What the system is designed to support.

  • Improved surface hardness
  • Reduced dusting on suitable concrete
  • Can support a durable maintenance surface

Applications

Typical environments.

  • Factory floors
  • Industrial slabs
  • Concrete prep
  • Manufacturing
  • Processing
  • Warehousing

Installation sequence

From substrate condition to final handover.

  1. 01Concrete assessment
  2. 02Clean and prepare the slab
  3. 03Apply densifier in the planned sequence
  4. 04Remove residue and inspect the finish

Considerations

What should be reviewed before specification?

  • The existing concrete must be suitable for densification.
  • Surface preparation and curing conditions affect the result.
  • Densification is not a substitute for repairing structural or severe substrate defects.

Maintenance

Performance continues after installation.

Use a regular dust-control and cleaning routine, and inspect areas where abrasion or contamination is concentrated.

Questions

Useful answers before the site assessment.

What does concrete densification do?

It treats suitable concrete to improve surface hardness and reduce dusting.

Is it a coating?

It is a treatment to the concrete surface rather than a conventional resin coating system.

When is repair needed first?

Cracks, unsound concrete, contamination or major surface defects should be assessed and addressed before densification.

Next step

Specify the right floor for the way your facility works.